Core Technologies and Applications
Current core technologies owned by JCHX include:
Steady Transiting from Open Pit to Underground Mining in Complex Mine and No-Waste Mining
Heating and Thermal Insulation for Capital Construction of Mines in Cold Zone
Ground Control and Inter-Level Shifting During Underhand Hexagonal Drift and Fill Mining
Paste Filling in Upperhand Cut & Fill Mining
Application of TBM in Potash Mine (Exclusively Owned Technology)
Rapid Drifting & Shaft Sinking in Metal Mines under Hard Rock Condition
High Quality & Efficient Decline Development
Paralleled Shaft Sinking & Headframe Erection
Pre-Installation for Shaft Deepening
Ground Support in Poor Strata with High Horizontal Stress
Handling Blockage in Ore Pass with Boosters
Fast Sinking of Large & Deep Shaft
Mucking with Conveyor Belt Through Incline in Metal Mines
R&D Achievements
Remarkable achievements were made by JCHX through dynamic integration of technological research and innovation, engineering design consultation and project management.
S&T Achievements
Code for design of nonferrous metal mining Code for underground opening acceptance of non-ferrous metal mines Code for design of underground opening ofnon-ferrous metals mine Code for underground opening installation acceptance of non-ferrous metal mines First Prize of 2011 Miyun County S&T Award (rapid drift excavation
technology by drilling jumbo for non-coal mines)Second Prize of 2013 S&T Award by China Non-Ferrous Metals Industry Association (study of comprehensive technology for decline
excavation with high quality and efficiency)Third prize of 2013 S&T Award by China Non-Ferrous Metals Industry
Association (study of new technology for chute development at areas
with complicated formation)Main shaft sinking and passing & crushing system development of the
mining project at XI block of Tonglushan Mine for Daye Nonferrous
Metals GroupExcellent project certificate for Dabaozhuang Pyrite Mine at Lujiang, Anhui (April 3, 2013) Study of comprehensive technologies for steady transfer from open
pit to UG mining and wasteless mining at complicated mining areasNew main shaft sinking of the reconstruction and expansion works of
3000 tpd mining and processing project for Hubei Sanxin Gold Copper
Limited CompanyExcellent construction certificate for mining preparation decline
of Jinchuan projectExcellent construction certificate for the belt conveyor of Kailin
projectValidation project at Dongtai Potash Mine in Laos Study of heating and thermal insulation for capital construction of
mines at cold areasCapital development and infrastructure construction at the west
orebody of Chambishi Copper Mine in ZambiaSecond Prize of S&T Award by China Non-Ferrous Metals Industry
Association (drift excavation and support in poor strata with
high stress)First Prize of S&T Award by China Non-Ferrous Metals Industry
Association (study of rapid UG construction at metal mines
under hard rock condition) Excellent construction certificate for 1170 main adit at YongshabaMine of Kailin Group Excellent construction certificate for underground works of mining and processing project (phase Ⅰ) at Pulang Copper MineOre Drawing System of UG Development Works for Mining and Processing Project (Phase Ⅰ) at Pulang Copper Mine Excellent Work Certificate for Main Shaft Sinking and Lining Works at Musonoi Cooper & Cobalt Mine in DRC Excellent Work Certificate for 980mL Inset Development for Service Shaft at Southeast Oerbody of Chambishi Copper Mine in Zambia
Core Technologies and Applications
Current core technologies owned by JCHX include:
* Steady transfer from open pit to UG mining and wasteless mining at complicated mining areas;
* Heating and thermal insulation for capital construction of mines at cold areas;
* Ground control and inter-level shifting during underhand hexagonal drift and fill mining;
* Paste filling for upperhand cut & fill mining;
* Application of TBM at Potash Mines (Exclusively Owned);
* Rapid UG construction at metal mines under hard rock condition;
* High quality & efficient decline development;
* Paralleled shaft sinking & tower construction;
* Pre-Installation for Shaft Deepening;
* Ground support in poor strata with high horizontal stress;
* Handling chute blockage with boosters;
* Fast Sinking of Large & Deep Shaft;
* Mucking with conveyor belt through incline at metal mines.
Technology Applications: